Yash Enterprise
Request a Quotation
Application guide · example scenario

Metering and control for a new LT panel

A panel builder is building an LT distribution board for a manufacturing plant. Every outgoing feeder must be metered, and the client wants the data centrally, not read off individual meters.

The approach

The approach: Elmeasure networked multifunction meters on each feeder, linked over Modbus to a gateway for plant-wide monitoring. BCH contactors and overload relays handle motor feeders; Suraj terminal blocks and cam switches handle control wiring. One distributor means one PO, one delivery and one point of contact.

Why it matters

Load-wise energy visibility from day one, and a whole bill of materials sourced in one place.

Brands in this scenario
Call Now WhatsApp